Resource Type

Journal Article 6

Year

2022 1

2021 1

2017 1

2015 1

2014 1

2008 1

Keywords

combustion 2

combustion duration 2

Duration forecasting 1

Earned duration management 1

Earned value management 1

Stochastic project control 1

Uncertainty 1

activity-on-node diagram 1

advance 1

building information modeling 1

construction cost 1

construction duration 1

consumption 1

cryostorage duration 1

diesel 1

economic performance 1

exhaust gas recirculation (EGR) 1

heat release rate (HRR) 1

human metaphase II oocyte 1

hydrogen 1

open ︾

Search scope:

排序: Display mode:

Effects of vitrification and cryostorage duration on single-cell RNA-Seq profiling of vitrified-thawed

Ying Huo, Peng Yuan, Qingyuan Qin, Zhiqiang Yan, Liying Yan, Ping Liu, Rong Li, Jie Yan, Jie Qiao

Frontiers of Medicine 2021, Volume 15, Issue 1,   Pages 144-154 doi: 10.1007/s11684-020-0792-7

Abstract: transcriptomes of mature human oocytes are induced by the procedure itself, suggesting that long-term cryostorage

Keywords: human metaphase II oocyte     vitrification     cryostorage duration     single-cell RNA-Seq     lncRNA    

Construction Duration and Cost Simulation via Network-Program-Diagram

Wei-dong Wang,Jie Wu,Kai-jun Wang,Xin Wen

Frontiers of Engineering Management 2014, Volume 1, Issue 2,   Pages 210-217 doi: 10.15302/J-FEM-2014028

Abstract: This paper outlines the creation of a simulation model used to extrapolate duration and resource requirementsdata for every process in an applicable construction project can be aggregated to form overall project durationBased on the simulation results of every procedure’s duration and resource requirements, the Network

Keywords: construction duration     construction cost     activity-on-node diagram     building information modeling    

Research on simulation evaluation method based on duration contro-llability of network schedule

Pan Feifei,Wang Renchao and Cao Yonglei

Strategic Study of CAE 2015, Volume 17, Issue 1,   Pages 143-150

Abstract: coping with project delay caused by risk events,a stochastic simulation evaluation method based on durationThrough the stochastic simulation of each risk events occur time, delay of activity duration and effectof the risk reaction,the distribution of project duration was simulated which was utilized to evaluateA case indicates that,compared with traditional simulation evaluation methods such as duration-basedand factors-based Monte-Carlo simulation, simulation results of the duration controllability-based is

Keywords: network schedule; stochastic simulation; risk reaction; duration controllability; evaluation    

Stochastic Earned Duration Analysis for Project Schedule Management Review

Fernando Acebes,David Poza,José Manuel González-Varona,Adolfo López-Paredes

Engineering 2022, Volume 9, Issue 2,   Pages 148-162 doi: 10.1016/j.eng.2021.07.019

Abstract:

Earned duration management (EDM) is a methodology for project schedule management (PSM) that can beEDM provides an estimation of deviations in schedule and a final project duration estimation.

Keywords: Earned duration management     Earned value management     Stochastic project control     Duration forecasting    

Combustion and emissions of the diesel engine using bio-diesel fuel

YUAN Yinnan, MEI Deqing, WANG Zhong, ZHANG Tian

Frontiers of Mechanical Engineering 2008, Volume 3, Issue 2,   Pages 189-192 doi: 10.1007/s11465-008-0021-6

Abstract: release peak declines a little, the corresponding crankshaft angle changes in advance, and the combustion duration

Keywords: advance     combustion     consumption     economic performance     combustion duration    

Combustion analysis of a hydrogen-diesel fuel operated DI diesel engine with exhaust gas recirculation

M. LOGANATHAN, A. VELMURUGAN, TOM PAGE, E. JAMES GUNASEKARAN, P. TAMILARASAN

Frontiers in Energy 2017, Volume 11, Issue 4,   Pages 568-574 doi: 10.1007/s11708-017-0461-y

Abstract: Many of the combustion parameters like heat release rate (HRR), ignition delay, combustion duration,The HRR peak pressure decreased with the increase in EGR rate, while combustion duration increased with

Keywords: hydrogen     exhaust gas recirculation (EGR)     diesel     combustion     heat release rate (HRR)     combustion duration    

Title Author Date Type Operation

Effects of vitrification and cryostorage duration on single-cell RNA-Seq profiling of vitrified-thawed

Ying Huo, Peng Yuan, Qingyuan Qin, Zhiqiang Yan, Liying Yan, Ping Liu, Rong Li, Jie Yan, Jie Qiao

Journal Article

Construction Duration and Cost Simulation via Network-Program-Diagram

Wei-dong Wang,Jie Wu,Kai-jun Wang,Xin Wen

Journal Article

Research on simulation evaluation method based on duration contro-llability of network schedule

Pan Feifei,Wang Renchao and Cao Yonglei

Journal Article

Stochastic Earned Duration Analysis for Project Schedule Management

Fernando Acebes,David Poza,José Manuel González-Varona,Adolfo López-Paredes

Journal Article

Combustion and emissions of the diesel engine using bio-diesel fuel

YUAN Yinnan, MEI Deqing, WANG Zhong, ZHANG Tian

Journal Article

Combustion analysis of a hydrogen-diesel fuel operated DI diesel engine with exhaust gas recirculation

M. LOGANATHAN, A. VELMURUGAN, TOM PAGE, E. JAMES GUNASEKARAN, P. TAMILARASAN

Journal Article